Energy Recovery Case Study: City of Edmonton

The City of Edmonton has a population of around 800,000. It currently converts over 60 per cent
of its municipal solid waste into saleable products. Approximately 45,000 tonnes of materials are
recycled, 70,000 tonnes are sold as compost and 95,000 tonnes are landfilled. The lack of
available landfill space, and failure to locate a new landfill site, has led to increased need for
additional diversion processes. A proposed new pre-processing facility and biofuels plant to be
commissioned in 2011 will increase diversion to 90 per cent and will include virtually all nonrecycled
residual plastics.

Check Also

Keeping waste disposal responsible

A single construction site can generate a surprising amount of waste long before a building is completed. Broken concrete, steel cuts, timber formworks, plastic wrappings and other excess materials are standard byproducts of any development, often unavoidable. With plenty of developments currently underway, is Malaysia’s landfill space becoming increasingly constrained? What happens to the debris after it leaves the site is a common question and it is drawing even greater attention as the country keeps building.