The European Commission is under an obligation to prepare a report for the Parliament and Council on the implementation of the EU Directive on end of life vehicles (ELVs). The Commission opted to do this using a Stakeholder Working Group consultation process, chaired by Bill Duncan – Director of ASSURRE.
The final report of the Stakeholder Working Group which comprised Industry, Member States and Regional Governments and NGOs is now available.
Conclusions
Waste fractions are differently defined, and treatment methods are differently classified across the Member States. Not enough ELVs are being captured within the national certified ATF systems. Too many are not being picked up by a functioning deregistration system, and are therefore either being diverted via unauthorized channels, or are simply being dumped illegally.
In some countries, an adequate infrastructure does not exist, either for "quality" dismantlers who are or could be certified, or for shredder capacity within the country.
In order to meet the 2015 Reuse and Recycling target of 85% would require as much as 50% of the non metallic rest fraction to find profitable new markets as recycled products i.e. assuming 75% by weight of ELVs are metals, and accepting that 5% by weight of ELVs can be disposed of in landfills, then 20% of the ELV is the non metallic rest waste fraction. Reuse of spare parts will modify this equation to some degree. It stands to reason that this will simply not happen as long as the lack of markets and the negative costs remain insurmountable barriers to progress. A more flexible approach is needed to lower costs and facilitate the development of alternative routes to achieve the Directive‘‘s key objective of reducing the disposal of waste.
Lack of robust monitoring systems makes a really reliable assessment of the status quo difficult (and much of the data comes only from ATF‘‘s). However, there is enough evidence to suggest that many countries are struggling with "on the ground" implementation.
The lack of drivers for change, whether legislative (at the grass roots Member States level), or economic (funding, incentives, profitable markets) will hold back the development of the ELV waste sector. The biggest single issue is that 40% or more of ELVs in several Member States are not being captured by the certified systems in place and therefore the Directive is largely failing in its objective of achieving a high level of environmental protection.
Many cars are being sold and legally exported second hand, in the main to the new Member States. This trend may cause some difficulty in predicting ELV flows in some Member States, but has no impact on the realisation of the ELV Directive targets. The complexity of the process chains, as well as the numerous actors involved, makes it difficult to achieve a high degree of data reliability especially in the early phase of implementation. Nevertheless, it is probable that many Member States will report reuse, recycling and recovery performances more or less in line with the 2006 targets, based upon those ELVs captured and using their own definitions and interpretations.
The report considers that some of the new Member States may not however be able to develop their systems quickly enough to meet the 2006 targets on time
Check Also
Egypt reviews Red Sea waste management system – Dailynewsegypt
Egypt’s Minister of Local Development and Environment, Manal Awad, and Red Sea Governor Walid El-Barqi held an extensive meeting to review the performance of the governorate’s waste management system and discuss measures to improve environmental services and operational efficiency. The meeting, held during Awad’s visit to the Red Sea Governorate to mark World Environment Day, focused on assessing current challenges facing waste collection, sorting, recycling and disposal operations, as well as identifying priority actions to strengthen the system’s performance. Awad stressed that the government places significant importance on developing an integrated waste management system in the Red Sea Governorate, given its strategic importance as one of Egypt’s leading tourism destinations. She emphasized the need to comply with environmental and technical standards governing sanitary landfills, waste treatment facilities and environmentally sound disposal practices. During the meeting, officials reviewed the current status of waste management operations in Hurghada, including collection, transportation, sorting, recycling and final disposal activities. Discussions also covered the infrastructure upgrades required to improve system efficiency and ensure the proper operation of sanitary landfill facilities. Yasser Abdullah, head of Egypt’s Waste Management Regulatory Authority, presented updates on temporary waste collection and sorting sites and outlined measures to strengthen operational management and oversight. He highlighted the importance of improving monitoring mechanisms for waste handling activities and maximizing the recovery of recyclable materials while reducing informal and unregulated practices.
Web-Resol Tudo sobre Limpeza Urbana e Resíduos Sólidos!