The task
S Grundon Ltd operates a clinical waste incinerator and municipal waste recycling facility at its Colnbrook facility near Heathrow. The company wished to redevelop this into an integrated waste management facility including an energy from waste (EfW) plant treating 440,000 tonnes/year of municipal waste.
How we helped
As part of the project team, AEA Energy & Environment* provided technical consultancy services including airquality
assessments and representation at public meetings. We assisted in successful applications for planning and for Environment Agency IPC approval. S Grundon Ltd now plans to update the IPC application to reflect the updated requirements of Integrated Pollution Prevention and Control (IPPC).
Check Also
Keeping waste disposal responsible
A single construction site can generate a surprising amount of waste long before a building is completed. Broken concrete, steel cuts, timber formworks, plastic wrappings and other excess materials are standard byproducts of any development, often unavoidable. With plenty of developments currently underway, is Malaysia’s landfill space becoming increasingly constrained? What happens to the debris after it leaves the site is a common question and it is drawing even greater attention as the country keeps building.
Web-Resol Tudo sobre Limpeza Urbana e Resíduos Sólidos!