BFI Canada’s Lachenaie landfill is the nearest landfill facility serving the waste disposal needs of Montreal, Quebec — a community of 3.5 million people. The Lachenaie landfill site is located on the north shore adjacent to the extreme east of Montreal Island, crossed by highways 40 and 640. The annual capacity of the landfill handles about a third of Montreal’s waste; the city disposes approximately 3.8 millions tonnes of non-hazardous solid waste annually.
In 1994, BFI designed and built a landfill gas extraction system at the landfill. The following year it constructed a power plant that features a 4-megawatt (MW) reciprocating Waukesha 7042 GL engine plant to produce electricity. This power plant benefited from the company’s experience designing and building seven such installations in the United States.
The company established a 25-year agreement with Hydro-Quebec for the purchase of the electricity generated by the landfill biogas — the first such operation in Quebec. The plant generates enough electricity to power approximately 2,500 homes.
An important side benefit of the energy project is that it reduces greenhouse gas emissions. The reduction (approximately 600,000 tonnes of carbon dioxide equivalent) is roughly equal to the amount of carbon dioxide emitted by 160,000 cars in a year.
The idea for the project grew in tandem with an aggressive action plan from the Quebec government that decided in 1998 to recycle waste at a rate of 67 per cent by 2008. (This included municipal waste, as well as industrial, commercial and institutional [IC&I] waste and construction/demolition [C&D] debris.) By 2001 the City of Montreal achieved a recycling rate of 17 per cent for its municipal solid waste stream. The annual quantity of biogas generated from waste buried in the landfill was projected with estimates that used the recycling rate objectives of the Quebec government. The calculations determined the total airspace that is likely to be available in the landfill (which will be used up in 40 years).
According to the company, around 50 per cent of the total waste received at the Lachenaie landfill is municipal solid waste, 43 per cent is IC&I and the remainder is C&D debris and sludge from municipal wastewater treatment plants.
Landfill design and gas collection
The Lachenaie landfill cell is built like a vault in clay. The design leaves at least 10 meters of clay under the bottom of the cell, exceeding proposed provincial regulations that require a minimum six meters of clay. A state-of-the-art system collects leachate and the bottom of the cells is covered with sand that filters solid particles from the leachate.
The leachate is pumped through a treatment system comprised of three lagoons. The first pond acts as an anaerobic system; the other two use aerators to reduce organic pollutants before discharge to the municipal wastewater treatment facility (owned by the Townships of Terrebonne and Mascouche).
Eventually the maximum height allowed by the facility’s certificate of approval issued by the Quebec Ministry of the Environment is reached for each cell. Clay excavated from a new cell is then used to cap each completed cell. This occurs after the final drainage cap is installed over the last layer of buried solid waste. To complete the structure, topsoil is added above the clay cap and seeded.
Landfill gas is extracted via a number of wells drilled into the waste. The wells extend to approximately two meters above the bottom of the waste. Well installation is an ongoing process with new wells added to the gas collection system as landfill cells are filled and capped. Currently, about 250 wells are in place. The well risers are constructed of high-density polyethylene (HDPE) pipe. Each wellhead is equipped with sampling ports and a valve to allow measurement, to control extraction vacuum and to limit oxygen ingress into the waste (to av
Check Also
Waste management poses challenges, but could unlock major environmental and economic gains
Every day, the city of Rio de Janeiro, one of the largest metropolises in the Southern Hemisphere, generates 17,000 tonnes of waste, ranging from large industrial debris to candy wrappers bought innocently at newspaper stands. While this waste presents a serious and urgent environmental challenge, it also fuels an increasingly significant portion of the economy, with benefits extending beyond financial gains. - When we look at developed European countries, many are already recycling between 40% and 50%, with some reaching 60%. From an economic standpoint, both recyclable materials and organic waste hold tremendous value - stated Adalberto Maluf, National Secretary for Environment and Environmental Quality at the Ministry of the Environment (MMA), during the Methane Forum: Climate Emergency Brake, at the Rio Nature and Climate Week. Citing a 2025 report, Maluf mentioned that Brazil literally throws away R$27 billion annually, while municipalities spend significantly more - R$45 billion - managing all this waste, often overlooking the environmental impact or economic potential buried in landfills and dumps. - We spend R$45 billion to collect and dispose of waste in landfills, yet we manage to recycle less than a third of the potential. I believe it will be necessary to review contracts, create performance-based remuneration mechanisms, and pay for both effectively sorted materials and those diverted from landfills - he added. According to the IBGE, 60.5% of Brazilian municipalities adopt some form of selective waste collection, and several initiatives serve as examples of how to manage city waste. In his panel presentation, Bernardo Ornelas, Project Coordinator at the Rio de Janeiro Municipal Urban Cleaning Company (Comlurb), highlighted Ecoparque do Caju, a national benchmark in waste management and recycling. There, received materials are sorted and can be used for biogas production, organic compounds for urban gardens, or human consumption, in the case of still...