There are very few construction and demolition (C&D) waste recycling centres in
Brazil. Data relating to C&D waste management and recycling in Brazil were collected and
analysed to encourage the building and operation of new units. Based on the results of this
analysis, a conceptual model was proposed to perform feasibility studies of future C&D waste
recycling centres.
Applying this model to verify the feasibility of private recycling centres, negative results
show that C&D waste recycling centres in current market conditions in Brazil are not financially
feasible if based solely on revenue from the sale of processed products. A case study for the city
of Rio de Janeiro is discussed.
The conceptual model, results of its applications in the city of Rio de Janeiro and their
analysis can strongly support public authorities and private initiatives in their decision-making
about investments in waste recycling centres in Brazil and in other developing countries.
Check Also
Keeping waste disposal responsible
A single construction site can generate a surprising amount of waste long before a building is completed. Broken concrete, steel cuts, timber formworks, plastic wrappings and other excess materials are standard byproducts of any development, often unavoidable. With plenty of developments currently underway, is Malaysia’s landfill space becoming increasingly constrained? What happens to the debris after it leaves the site is a common question and it is drawing even greater attention as the country keeps building.
Web-Resol Tudo sobre Limpeza Urbana e Resíduos Sólidos!