USA – home deconstruction proves cost competitive and yields reusable materials

The US EPA reports that a terrace house located in Philadelphia‘‘s Strawberry Mansion neighborhood was chosen for experimental deconstruction.



Long perceived as having little value, old and condemned properties are proving to be a treasure trove of architectural elements and reusable building materials. In a bid to promote deconstruction as a viable building removal strategy, the Institute for Local Self-Reliance (ILSR) recently led an effort to salvage bricks, metal, lumber, and architectural features with lasting market value from an abandoned home in the Strawberry Mansion neighborhood of Philadelphia, Pennsylvania. The project netted more than $7,500 worth of recovered materials.



Deconstruction is an earth-friendly approach to demolition. It means that workers disassemble a structure‘‘s components so that the materials can be processed and sold for reuse. Every brick, stick of lumber, or salvaged architectural detail removed from the waste stream saves valuable landfill space, conserves production energy and can potentially add beauty and historical value to a new construction project.



In 2005, EPA awarded a grant to ILSR to determine cost-effective methods to recover and reuse lumber and other materials from one of the city‘‘s abandoned houses. Among the materials recovered from the old home, turrets have an added artistic value and can claim a higher value when sold as an architectural item than recycled as scrap iron or metal.



A Susquehanna Avenue row house was chosen for deconstruction because it dated from the turn of the 20th century and had materials and architectural details that were marketable, including a turret, cabinetry, and detailed metalwork. The project became known as the Susquehanna Deconstruction Pilot Project.



Deconstructing the 2,100-square-foot house took about 10 days, longer than a straight demolition job. And, despite a few lessons learned, such as the need for on-time dumpster services and the value of achieving an economy of scale (removing more than one house at a time), ILSR and its partners consider the project an important success. They showed that deconstruction can be cost-competitive with hand demolition when there are sufficient recoverable materials with market value to offset higher labor costs. Deconstruction costs $8.94 per square foot, which falls within the range of the average hand demolition cost ($7.75 to $9.30 per square foot).



To date, more than $6,530 worth of the salvaged materials has been sold or directly used by the contracted deconstruction company.



The Susquehanna project exemplifies the type of activity encouraged by our own Resource Conservation Challenge within the national priority area of Recycling Industrial Materials.

Check Also

Egypt reviews Red Sea waste management system – Dailynewsegypt

Egypt’s Minister of Local Development and Environment, Manal Awad, and Red Sea Governor Walid El-Barqi held an extensive meeting to review the performance of the governorate’s waste management system and discuss measures to improve environmental services and operational efficiency. The meeting, held during Awad’s visit to the Red Sea Governorate to mark World Environment Day, focused on assessing current challenges facing waste collection, sorting, recycling and disposal operations, as well as identifying priority actions to strengthen the system’s performance. Awad stressed that the government places significant importance on developing an integrated waste management system in the Red Sea Governorate, given its strategic importance as one of Egypt’s leading tourism destinations. She emphasized the need to comply with environmental and technical standards governing sanitary landfills, waste treatment facilities and environmentally sound disposal practices. During the meeting, officials reviewed the current status of waste management operations in Hurghada, including collection, transportation, sorting, recycling and final disposal activities. Discussions also covered the infrastructure upgrades required to improve system efficiency and ensure the proper operation of sanitary landfill facilities. Yasser Abdullah, head of Egypt’s Waste Management Regulatory Authority, presented updates on temporary waste collection and sorting sites and outlined measures to strengthen operational management and oversight. He highlighted the importance of improving monitoring mechanisms for waste handling activities and maximizing the recovery of recyclable materials while reducing informal and unregulated practices.