In the extreme tropical area of Kuching with an annual rainfall between 6,500 and
7,200 mm a leachate treatment plant is operated which has to keep Standard B of the Malaysian
Environmental Quality Act 1974. The plant consists of biological, chemical and physical
treatment steps.
Since the plant´s capacity is limited to 350 m³/d the landfill operation especially surface
covering has to be done on a high level.
By using the statistical tool of the cumulated frequencies line it could be shown that the plant´s
performance with regard to the COD effluent concentration could be improved distinctly within
the last two years
Check Also
Keeping waste disposal responsible
A single construction site can generate a surprising amount of waste long before a building is completed. Broken concrete, steel cuts, timber formworks, plastic wrappings and other excess materials are standard byproducts of any development, often unavoidable. With plenty of developments currently underway, is Malaysia’s landfill space becoming increasingly constrained? What happens to the debris after it leaves the site is a common question and it is drawing even greater attention as the country keeps building.